Hua’an

1 Equipment on-site management

1.1 Equipment production site

Mine equipment is operating under poor working conditions, and there are various hidden safety hazards and risks. Standardized production site management can effectively avoid various hidden safety hazards and risks.

In production activities, various irregular operation phenomena that equipment operators often occur include:

During the operation of the equipment, the operator left the equipment without turning off the flame;

When the operator uses the equipment, it is directly started and used without inspection;

The operator found the equipment malfunction but still used the equipment forcibly, resulting in damage to the equipment;

After the work, the operator did not park the equipment to the designated safe location, etc.

Standardized production site management can not only improve the safety of equipment operation, but also extend the operating time of the equipment, greatly reducing the production and operating costs of mining equipment.

1.2 Equipment maintenance site

There are many mining equipment in the workshop, with various types and models. It is inevitable that various faults will occur in the production activities, which will cause the equipment to fail to operate normally. At this time, maintenance personnel are required to troubleshoot. According to the size and type of the fault, maintenance can be divided into on-site maintenance and repair room maintenance.

When performing maintenance at the production site, it is necessary to do a good job of alert and isolation according to the actual situation on the site. When disassembling and assembling parts, various preparations must be made to prevent the parts from being misplaced and lost. At the same time, it is necessary to prevent the equipment oil from leaking to the ground when disassembling parts and components, causing pollution to the environment.

When the equipment fails and needs to be moved to the repair room for maintenance, the repair site and equipment must be isolated from other workers to prevent accidental injury to personnel or loss of machine parts during the maintenance process. During the maintenance, the staff need to use the special tool rack for tool collection and retrieval, which can not only improve the maintenance efficiency, but also prevent the loss of maintenance tools.

2 Equipment technology management

2.1 Technical data management

Different types and models of equipment have different technical data, which increases the difficulty of technical data management. When purchasing equipment, it is necessary to conduct a comprehensive comparison of equipment of different brands (including parts procurement, maintenance technical support, maintenance information and required maintenance tools, etc.) according to the actual working conditions to find the most suitable equipment.

Form the "Internet +"
120 employees stay at RAG. Although only the winding towers as industrial monuments seem to be reminiscent of hard work, the miners are still on duty in several underground mines. RAG still has 120 employees responsible for ensuring stable drainage, and another 120 employees from external companies. Many mines are connected to each other in an extensive network of branches underground. Mine water combined with salt and minerals gathers in the tunnel. In order to prevent it from contacting groundwater, it must be pumped. By 2030, there will still be six vertical shafts for drainage. At present, mountain destruction may continue to exist. Many mine residents complained about cracks in the walls of their houses or apartments. Because mining is done underground, the earth sinks again and again. RAG assumes that the ground will slowly stabilize, but damage will still occur. New plans for the old mine. When Prosper Haniel is completely filled in January, the site will be ready when the 160-year history is over. The city of Bottrop is already making plans for an industrial park. But it will take several years to achieve this. Bottrop’s mayor Bernd Tischler said of the marathon: “On the way, we only completed 10% of the distance,” the mayor said.
buttontext 白箭头 黑箭头
Tongli Heavy Industry
Everything for the customer's philosophy serves everyone. Investment and Financing Guarantee Co., Ltd. is mainly dedicated to project public relations, providing solutions such as venture capital financing analysis for Internet projects. The company has reached cooperation with a number of venture capital companies to find the best Internet projects for investment companies and the best for Internet projects Investor, the company's special partner, Shanghai Langrong Capital, Chairman Fang Chenggang, conducts real-time monitoring of the Internet project cooperated with Shanghai Hongsheng Group, and provides financing solutions for partners.
buttontext 白箭头 黑箭头
Enter the mining machinery market
In this context, Zhao Ping, general manager of the mining equipment industry portal, has made in-depth thinking about the industry. He said: "In order to promote the continuous development of the mining equipment industry, major mining machinery and equipment manufacturers are constantly changing and looking for New development direction. Green environmental protection has become the main direction of development in recent years. While reducing environmental pollution, it can make parts of each part easier to be recycled, reduce unnecessary pollution, and realize a comprehensive environmental development strategy."